Services / Homes & renovations

Electrical work for homes, from one power point to a full renovation.

Repairs, upgrades and new installations for houses across Newcastle and Lake Macquarie, from older weatherboard homes with original wiring to new builds.

Fixed price on most jobs. Same-week bookings for small work. Certificate of Compliance for Electrical Work provided.
Repairs and small jobs

Repairs and general electrical work

Smaller jobs can be combined into a single visit.

  • Power points, double outlets and USB sockets
  • Light switches and dimmers
  • Ceiling fans, with or without lights
  • Fault finding: tripping, flickering, dead circuits
  • Safety switch that won't reset
  • Smoke alarms, interconnected and 10-year lithium
  • Oven, cooktop and rangehood connections
  • Hot water elements and thermostats
  • Bathroom heat, light and exhaust units
  • Outdoor power points and garden lighting
  • Shed and garage power and lighting
  • TV, data and phone points
Discoloured or cracked power points are worth replacing even if they still work. Old cream or yellowed outlets from the 70s and 80s have brittle plastic and worn contacts. A set of new ones is a cheap job that makes a noticeable difference to how a room looks.
Bedroom with a white ceiling fan with built-in light and LED downlights in the ceilingBedroom
Living room with a white ceiling fan with built-in light and LED downlights in the ceilingLiving room
Ceiling fans and LED downlights

Ceiling fans with built-in LED lights in the bedroom and living room, with new LED downlights around them. Each fan is fixed to the roof framing, and the downlights sit clear of the blades so the light doesn't flicker when the fan is running.

Switchboards and safety

Switchboard and mains upgrades.

Many older houses still have rewirable ceramic fuses, or a board that has been added to over the years with safety switches (RCDs) on only some circuits. For new work, the Wiring Rules require RCD protection on every final circuit in a home. An upgrade brings the whole board to that standard.

Old switchboard with the cover off: mismatched breakers and a tangle of red, white and blue wiringBefore
Same enclosure rebuilt with a neat row of labelled safety switches and the wiring dressed into tidy loopsAfter
What a switchboard upgrade involves

We replace the enclosure, fit a main switch and a combined safety switch and circuit breaker (an RCBO) on every circuit, so a fault on one circuit doesn't drop the whole house. We add surge protection, label every circuit properly, test the installation and issue the Certificate of Compliance.

If the old panel is asbestos-backed, which many pre-1985 boards are, we remove and dispose of it in line with SafeWork NSW requirements.

Time on site
Usually one day. Power is off for three to five hours.
Good time to do it
Before a renovation, when adding an EV charger or induction cooktop, or if a safety switch keeps tripping and nobody can tell you why.
Also worth knowing
Some insurers ask about safety switches. A new board with a certificate is a straightforward answer.
Meter box with a row of old plug-in circuit breakers under the meter, wiring exposed and no safety switchesBefore
Same meter box with a new white enclosed switchboard under the meter and a row of labelled safety switchesAfter
Switchboard upgrade with a new main earth

Old plug-in breakers under the meter, live parts exposed and not a safety switch on the board. We made this switchboard safe with all new safety switches, one on every circuit, and brought it up to current standards with a new main earth as well.

Everything now sits in a closed, labelled enclosure in the same meter box.

Why the earth matters
The main earth is what lets a safety switch do its job. On older houses it's often corroded, undersized or clamped to a water pipe that has since been replaced with plastic.
Time on site
Usually half a day.
Weathered old meter box on a weatherboard wall with a crowded switchboard and loose wiring under the meterBefore
New galvanised meter box on the same wall with a new switchboard above a new meter panel, everything labelledAfter
Meter board and consumer mains upgrade

A tired meter box with a crowded board and mains that were never sized for a modern house. We replaced the lot and brought the installation up to date with current regulations.

The new board is neat, organised and labelled, with spare room on it. The house now has the capacity for future electrical upgrades, whether that's an EV charger, an induction cooktop or a battery.

Included
New meter board and switchboard, consumer mains upgrade, new protection and circuit breakers throughout.
When it is needed
When the meter box is damaged or too small, when the mains can't carry what the house now draws, or before adding a big load.
Who is involved
Work on the service connection is carried out by a Level 2 Accredited Service Provider, and the meter is fitted by your electricity retailer's metering provider. We coordinate both, so you deal with one person.
Renovations and extensions

Kitchens, bathrooms and extensions, start to finish.

We work with your builder or directly with you. The earlier we're involved, the cheaper it is to get the lighting and power where you actually want it.

Kitchen mid-renovation with the cabinet carcasses in, pendant cables hanging from the ceiling and wiring poking out of the walls and islandBefore
Finished kitchen with three stone pendants over the island, under-cabinet lighting on and matte black power pointsAfter
How a renovation runs

Rough-in. Once the walls are open we run the new cables, mount the boxes and get everything in place for the plasterer. This is where we add circuits for the induction cooktop, the oven, the dishwasher and anything else drawing real power.

Fit-off. After the cabinets and tiles are in, we come back and fit the power points, switches, downlights, pendants and under-cabinet lighting, connect the appliances, test everything and hand over the certificate.

Kitchens
Island power, pendants, under-bench and in-cupboard lighting, appliance circuits, rangehood.
Bathrooms
Heat-light-fan units, mirror lighting, heated towel rail and underfloor heating circuits, outlets placed to the clearance rules.
Extensions
Often need a bigger switchboard or a sub-board. We check that first so there are no surprises later.
Ensuite with two backlit arched mirrors, LED strip glowing under a floating timber vanity and a lit niche in the showerFinished
Ensuite fit-off

The electrical side of an ensuite renovation. Backlit arched mirrors on their own switch, LED strip under the floating vanity, a lit niche in the shower, heated towel rail and underfloor heating circuits, and a quiet exhaust fan on a run-on timer.

Suburb
Kotara
Time
Rough-in and fit-off across the build
Type
Renovation
EV chargers and bigger loads

EV chargers, sheds and garages.

New sheds wired from scratch, garage power and lighting, EV chargers, dedicated circuits for induction cooktops and pool pumps. We check your supply and your board can handle the extra load before we quote.

Tesla Wall Connector mounted on a rendered wall with its cable coiled and an isolator switch beside itTesla Wall Connector
Sigenergy EV charger on an outside wall beside a garage housing the home battery and inverter22 kW Sigenergy
EV chargers, from a Wall Connector to solar-integrated

We've recently installed a range of EV chargers. Two of them: a Tesla Wall Connector on its own circuit with an isolator beside it, and a 22 kW Sigenergy charger fully integrated with the home's solar and battery system, so the car charges from the roof when the sun is out.

Before we quote any charger we check the switchboard and the supply can carry it.

Chargers we install
Most wall-box chargers, single and three phase. If you've already bought one, send us the model.
With solar or a battery
We set the charger up to work with the system you have, so it can favour surplus solar.
Before we quote
We'll ask for a photo of your switchboard and meter box.
Steel shed with the roller door up, four LED battens lit on the rafters and a workbench along the back wallFinished
New shed, wired from scratch

A sub-main from the house board to a small board in the shed, four LED battens on the rafters so there are no shadows over the bench, a run of power points along the back wall, an outside light over the door and a spare circuit left for a charger or a welder later.

Suburb
Cameron Park
Time
One day
Type
Sheds and garages
Questions

About work in your home

My safety switch keeps tripping. What should I do first?

Unplug everything on that circuit, reset the switch, then plug things back in one at a time. If it trips when a particular appliance goes in, that's your problem. If it trips with nothing plugged in, or you can't tell what's on the circuit, give us a call. Don't tape it on or bypass it.

Do I need to clear the room?

For ceiling work, move anything fragile off surfaces beneath where we'll be working. We bring drop sheets. For a switchboard, we need clear access to the board and to the roof manhole if there is one.

Can you match the switches and power points I already have?

Usually. Send a photo and we'll tell you whether that range is still available or what the closest match is. Black, matte white, brushed metal and the standard white are all easy to get.

I'm renting. Who should contact you?

Your landlord or property manager needs to approve and pay for the work, so it's best if they contact us. We're happy to deal with you directly for access and timing once that's sorted.

Send us a photo of the job.

For most home jobs a photo and a sentence is enough to give you a fixed price. If it needs a look first, we'll tell you.